New Installation Inspections

The septic contractor will notify us when the installation is ready for inspection. We strive to complete inspection requests within 24 hours for the system to be back filled.   An as-built drawing of the completed system will be completed in the field along with the associated written inspection forms. This is required by the health department prior to issuance of an operations permit. Elements of the review include inspection of:

  • Sewer Line
  • Septic Tank
  • Distribution Box
  • Conveyance Line
  • Lateral Lines
  • Any Additional Permit Requirements.

 